FAQS

ruby Can my pool be installed any time throughout the year? Yes. Installation can be done as long as the ground isn’t frozen

How long will it take to install my fiberglass pool? Your pool should be delivered to us within 3-4 weeks of receipt of your deposit. Your exact installation date depends upon weather and permits.

What’s included – BASIC INSTALLATION?

• Swimming pool of your Choice
• Crystite finish of your Choice
• Normal excavation
• Complete installation
• Transportation Permits
• Delivery to your site
• 40 cubic yards of sand
• Utility trenches – dug and back filled
• Hayward pump
• Hayward cartridge filter
• Skimmer, main drain, and returns
• All pool plumbing and fittings
• Concrete pad for pool equipment
• Temporary fencing around installation area
• Site grading and clean up
• Equipment Lesson
• Maintenance kit
• Inline Chlorinator
• Complimentary Pool opening
• Complimentary Pool closing

CAN I CUSTOMIZE MY POOL?
YES! Click here for all the options available:

What is not included?
• Permit application fees
• Utility connections
• Crane (if required)

• Water (we required one truckload to rapid fill pool during installation)

Is it more costly to operate a fiberglass pool?
No, electrical and chemical savings are about half of a concrete or liner pool.

Do you offer financing?
We don’t but suggest you check with your local bank as they will have home improvement loans.

What about the patio?
Yes! We can do the patio and the fence for you as well. Talk to your sales representative about all the services we can provide.

What about the fencing?
Our sister company, Townsend Fence, can provide all your fencing needs!

Leave a Reply

You must be logged in to post a comment.